Early bird
tickets
available now!
Job search
Job Search
Latest news
More news: (showing 1 - 20 of 13774)           
UK only International

Snøhetta unveil dramatic riverwalk design for North America's second largest waterfall

By Kim Megson    02 Jun 2017
For over a century, the Willamette Falls has been cut off from public access by industrial infrastructure built along the water’s edge / Snøhetta

International architecture firm Snøhetta have unveiled new details of the riverwalk they are creating for North America’s second largest waterfall.

For over a century, the 42ft high Willamette Falls has been cut off from public access by industrial infrastructure built along the water’s edge. Now, new public spaces are planned to offer observation points that do justice to the height and drama of the site.

The design, which has taken two years to finalise – which was completed in collaboration with Toronto-based architects Dialog, Portland-based landscape studio Mayer/Reed and a team of engineers and hydrologists – has been subject to a lengthy public engagement process.

The design team have treated the whole 22 hectare site as a single landscape, “with a network of promenades and lofted pathways that lace through the physical strata of the site, immersing visitors in a tactile experience that celebrates the changing water level, the feeling of the spray on your skin, the dramatic play of light and the roar and presence of the falls.”

The riverwalk, conceived as a series of islands with three main lookout stations, will begin at the entrance to Oregon City’s historic downtown and end at the crest of the falls themselves. Describing the concept, Snøhetta said they are creating “an archipelago carved from ancient basalt and industrial steel, concrete, and wood alike.”

Several of the old factory buildings on the site – including a paper mill, woolen mill and historic boiler compex – will be opened up and integrated with the walkway to chart the industrial history of the Pacific Northwest. The entire attraction will be built to withstand and accommodate regular flooding and seismic activity.

Construction at Willamette Falls is due to begin in June 2018. A model of the riverwalk design will go on public display tomorrow (3 June).

The infrastructure will be opened up and integrated into the new riverwalk / Snøhetta
Public areas and lookout points will feature along the walkway / Snøhetta
The project is conceived as a series of islands with three main lookout stations / Snøhetta
The riverwalk will begin at the entrance to Oregon City’s historic downtown and end at the crest of the falls / Snøhetta
A team of engineers and hydrologists have been consulted on the scheme / Snøhetta
Snøhetta  North America  architecture  design  riverwalk  Willamette Falls  
Sign up for FREE ezines
Related news
Related features
Sports jobs

Swim Manager

Everyone Active
Salary: Competitive
Location: Sutton-in-Ashfield, UK

General Manager

Coach Gyms
Salary: £40,000pa basic + bonus + commission
Location: Leeds, UK

General Manager

Tennis Swansea 365
Salary: £36,000 - £40,000pa + benefits
Location: Landore, Swansea, UK

Swim Teacher

Everyone Active
Salary: Competitive
Location: Middlesbrough, UK

Customer Service Advisor

Everyone Active
Salary: Competitive
Location: Middlesbrough, UK

Sports Facility Manager - LSBU Active

London South Bank University
Salary: £31,396 to £34,557, inclusive of £4,952 London Weighting
Location: London, UK

Team Leader

Everyone Active
Salary: £25,337pa + excellent benefits
Location: Bristol, UK

Fitness Motivator

Everyone Active
Salary: Competitive
Location: Gainsborough, UK

Swim Teacher

Everyone Active
Salary: Competitive
Location: Bristol
recruiting with sports management

Duty Manager (Dry)

Everyone Active
Salary: Competitive salary
Location: St Albans, UK

Head of Operations

Fife Sports and Leisure Trust Ltd
Salary: £56,107.80 - £63,165.86pa + benefits
Location: Dunfermline, UK

Senior Leisure Officer

East Devon District Council
Salary: £41,418 - £48,474pa + local govt pension + benefits
Location: Honiton, UK

Swimming Teacher

Everyone Active
Salary: Competitive rates of pay
Location: Rickmansworth, UK

Swimming Teacher

Everyone Active
Salary: Competitive rates of pay
Location: Watford, UK
Swimming Teacher jobs  duty manager jobs  Team Leader jobs  Swim Manager jobs  general manager jobs  recreation assistant jobs 
More jobs

Company profile

Company profile: Rubb Buildings Ltd
Rubb Buildings Ltd designs and manufactures relocatable, semi-permanent and permanent fabric engineered specialist sports buildings.
View full profile >
More company profiles

Featured Supplier

Altrafit introduces custom functional fitness equipment at Third Space
Altrafit has taken further steps to cement its reputation as a provider of high-quality, affordable functional fitness equipment that is built to last with the development and introduction of a new functional fitness keg for luxury gym operator, Third Space.
View full details >
More featured suppliers

Property & Tenders

Location: Jersey
Company: Jersey War Tunnels
Location: Chiswick, Gillingham, York and Nottingham
Company: Savills
Location: Cleveland Lakes, Wiltshire and Gloucestershire
Company: Cotswold Lakes Trust
Location: Loughton, IG10
Company: Knight Frank
Location: Grantham, Leicestershire
Company: Belvoir Castle
More properties & tenders

Diary dates

03-05 Sep 2024
IMPACT Exhibition Center, Bangkok, Thailand
08-10 Sep 2024
Wyndham® Lake Buena Vista Disney Springs™ Resort, Lake Buena Vista, United States
19-19 Sep 2024
The Salil Hotel Riverside - Bangkok, Bangkok 10120, Thailand
20-22 Sep 2024
Locations worldwide,
More diary dates